hit counter script

Ct Sensing Check; Connector Check; Wvc Connector Check; Ct Sensing Check Point - LG Therma V ZHBW056A0 Service Manual

Air-to-water heat pump
Table of Contents

Advertisement

2. CT Sensing Check

• Inspecting PCB phase current sensing circuit
1. Set Multi-tester DC voltage measurement mode.
2. Mesure the below mesureing point DC voltages at Power-on standby state.
3. If the measurements are outside DC 2.5V ± 0.2V, the parts are decided as burned.

3. Connector Check

W
V
U
<WVC connector check>
Red
<CT Sensing Check Point>
- 95 -
Copyright © 2018 LG Electronics Inc. All rights reserved.
Only training and service purposes.
GND
Vdc
Black

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents