Display
Title
code
23
DC Link Low Volt
28
DC Link High Volt
WARNING
Before checking PCB(Inverter) or each outdoor electric parts, wait for 3 minutes after the power is off. When measuring at standby
state of power supply, after checking the measurement mode of the meter, be careful of the short-circuits with other parts.
n Error Diagnosis and Countermeasure Flow Chart
Is input voltage normal ?
Yes
PCB assembly 1
Power connection normal?
Yes
Is PCB(Inverter) Normal?
Yes
Recheck power and installation
condition
Cause of error
• DC Link Voltage is
below 140 V DC
• DC Link Voltage is
above 420 V DC
No
Check power input voltage
No
Check power connection state
No
Replace PCB assembly 1
- 90 -
Check point & Normal condition
• Check CN_(L), CN_(N) Connection
• Check Input Voltage
• Check PCB DC Link voltage sensor parts
• Check CN_(L), CN_(N) Connection
• Check Input Voltage
• Check PCB DC Link voltage sensor parts
Copyright © 2018 LG Electronics Inc. All rights reserved.
Only training and service purposes.