Check Point
1. Check the WCN_P(L),P(N) Connection condition at the main PCB(Heater). (Refer to wiring diagram)
2. Check the DC Link voltage at not operating(280V↑)
3. Check the DC Link voltage at Comp operating(340V↑)
4. Check DC Link Sensing Signal(ZHBW**6A0) :2.4~2.8V (Refer the Picture)
5. Check DC Link Sensing Signal(ZHBW**8A0) :0.4~0.6V (Refer the Picture)
* ZHBW056A0 / ZHBW076A0 / ZHBW096A0
Red
GND
Black
<CT Sensing Check Point>
Vdc
- 91 -
Copyright © 2018 LG Electronics Inc. All rights reserved.
Only training and service purposes.