- BP chassis
Install the unit above the ceiling correctly.
CASE 1
POSITION OF SUSPENSION BOLT
• Apply a joint-canvas between the unit and duct to
absorb unnecessary vibration.
• Apply a filter Accessory at air return hole.
Dimension
A
B C
Capacity
9k/12k BTU/h 633 580 695 660 750 45 369 797 20 232 372
• Install the unit leaning to a drainage hole side as a
figure for easy water drainage.
CASE 2
POSITION OF CONSOLE BOLT
• A place where the unit will be leveled and that can
support the weight of the unit.
• A place where the unit can withstand its vibration.
• A place where service can be easily performed.
(Unit:mm)
D E
F
G H
I
J
K
C
A
B
H
Drainage hole
M10 Nut
X 4
(Local
M10 SP. washer
X 4
supply)
M10 washer
X 4
M10 washer
X 4
(Local
M10 SP. washer
X 4
supply)
M10 Nut
X 4
Service Manual 37
Installation