hit counter script

LG LS-J0762YL/NM/NN/NQ Service Manual page 46

Room air conditioner
Table of Contents

Advertisement

2) Balance refrigerant of the 2-way, 3-way valves
(Gas leakage)
• Procedure
(1) Confirm that both the 2-way and 3-way valves
are set to the back seat.
(2) Connect the charge set to the 3-way valve's
port.
– Leave the valve on the charge set closed.
– Connect the charge hose with the push pin to
the service port.
(3) Open the valve (Lo side) on the charge set
and discharge the refrigerant until the gauge
indicates 0 kg/cm
2
G.
– If there is no air in the refrigerant cycle (the
pressure when the air conditioner is not
running is higher than 1 kg/cm
the refrigerant until the gauge indicates 0.5 to
1 kg/cm
G. if this is the case, it will not be
2
necessary to apply a evacuatin.
– Discharge the refrigerant gradually; if it is
discharged too suddenly, the refrigeration oil
will also be discharged.
Indoor unit
Lo
OPEN
2
G), discharge
Liquid side
2-Way
valve
Gas side
3-Way
valve
CLOSE
-46-
Outdoor unit
Open
Open

Advertisement

Table of Contents
loading

Table of Contents

Uploaded: cache9/manual/819316/Lg-Ls-J0762yl-Nm-Nn-Nq.html%3Fpage%3D46.gz