Safety Precautions
Installation of Indoor, Outdoor Unit
Read completely, then follow step by step.
Select the best location
Indoor unit
1. Do not have any heat or steam near the unit.
2. Select a place where there are no obstacles in
front of the unit.
3. Make sure that condensation drainage can be
conveniently routed away.
4. Do not install near a doorway.
5. Ensure the unit is unobstructed, allow proper
space on all sides according to the arrows and
distance measurements in the figures.
6. Use a Metal Detector or Metal Scanner to locate
studs to prevent unnecessary damage to the wall.
[Ceiling Concealed Duct Type]
Top view
Inspection hole
[600(23-5/8) x 600(23-5/8)]
Control box
600
(23-5/8)
Front view
Service Space
* Suitable dimention "H" is necessary to get a slope to
drain as show in the figure.
Capacity(Btu/h class)
9/12k
600(23-5/8)
18k
600(23-5/8)
8 Multi Air Conditioner
600
(23-5/8)
H=20(25/32) or more
Ceiling
A
B
A
B
900(35-7/16)
1100(43-5/16)
[Wall mounted / ART COOL Mirror]
More than
100(3-15/16)
Recommended height
❈ Note : remove obstructions to prevent blockage of airflow path
Ceiling
Ceiling Board
500(19-
11
/
)
16
or more
30(1-3/16)
±3(1/8)
More than 200(7-7/8)
2000(78-3/4)
Unit:mm(inch)
[Ceiling Cassette Type]
10(
13
/
)
32
or more
500(19-
or more
Floor
[ART COOL Gallery]
More than
200(7-87/100)
More than
500(19-11/16)
More than
500(19-11/16)
1500(59-11/200)
More than
100(3-15/16)
Ceiling Board
11
/
)
16
Unit:mm(inch)
More than
Unit:mm(inch)