hit counter script

LG PQCPA11A0E Installation & Owner's Manual page 137

Advanced control platform air conditioner
Table of Contents

Advertisement

3
Setting the power control (text)
Desired power
Desired operation ratio
Operation switching period
Caution: Setting the demand control
Because the demand control is set by the externally connected demand controller, the
items such as desired power, desired operation ratio and operation switching period
can not be set wihin the LG ACCS program.
The setup item to set the wattage in kW or % is displayed at the right
side of the peak operation ratio control screen.
If it exceeds the setting value, the air conditioner is forcefully operated
periodically according to the peak power operation rule.
It displays the desired power in kW per hour to operate the
peak operation function.
It displays the desired power in % to operate the peak
operation function.
It displays the period to forcefully stop the operatioin.
3. ACP operation by using the LG ACCS
Installation/Owner's Manual
3-55

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pqcpb11a0e

Table of Contents

Uploaded: cache9/manual/243935/Lg-Pqcpa11a0e.html%3Fpage%3D137.gz