hit counter script

LG PQCPA11A0E Installation & Owner's Manual page 136

Advanced control platform air conditioner
Table of Contents

Advertisement

3. ACP operation by using the LG ACCS
Operation switching period
It displays the period for stopping the peak operation. For example, if it is set to 5
minutes period, the air conditioners with the peak operation are switched every 5
minutes, which controls the time for all air conditioners to stop constantly.
The operation switching period can be controlled within the range of 5~15 minutes.
2
Setting the current operation status and the power
Caution: Setting the demand control
Because the demand control is set by the externally connected demand controller, the
items such as desired power, desired operation ratio and operation switching period
can not be set wihin the LG ACCS program.
3-54
ACP
The graph for displaying the current operation status and setting the
power control function is displayed at the left side of the demand
control screen. The operator can use this graph to check the power
when all current installed air conditioners operate 100% and to check
the set target power.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pqcpb11a0e

Table of Contents

Uploaded: cache9/manual/243935/Lg-Pqcpa11a0e.html%3Fpage%3D136.gz