hit counter script

LG PQCPA11A0E Installation & Owner's Manual page 129

Advanced control platform air conditioner
Table of Contents

Advertisement

Operation switching period
It displays the period for stopping the peak operation. For example, if it is set to 5
minutes period, the air conditioners with the peak operation are switched every 5
minutes, which controls the time for all air conditioners to stop constantly.
The operation switching period can be controlled within the range of 5~15 minutes.
2
Setting the current operation status and the power control (graph)
Note: Changing the peak operation ratio
In order to change the peak operation ratio, except the method using
number input method described at the following section.
3. ACP operation by using the LG ACCS
The graph for displaying the current operation status and
setting the power control function is displayed at the left
side of the peak operation ratio control screen. The operator
can use this graph to check the power when all current
installed air conditioners operate 100% and to set the target
power.
In order to change the peak operation ratio, drag
the target power.
Installation/Owner's Manual
to set
, it can be set by the
3-47

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pqcpb11a0e

Table of Contents

Uploaded: cache9/manual/243935/Lg-Pqcpa11a0e.html%3Fpage%3D129.gz