FLARING WORK AND CONNECTION OF PIPING
12
FLARING WORK AND CONNECTION OF PIPING
Flaring work
Main cause for gas leakage is due to defect in flaring work. Carry out correct flaring work in the
following procedure.
Cut the pipes and the cable
- Use the piping kit accessory or the pipes pur-
chased locally.
- Measure the distance between the indoor
and the outdoor unit.
- Cut the pipes a little longer than measured
distance.
- Cut the cable 1.5m longer than the pipe
length.
Burrs removal
- Completely remove all burrs from the cut
cross section of pipe/tube.
- Put the end of the copper tube/pipe in a
downward direction as you remove burrs in
order to avoid dropping burrs into the tubing.
Putting nut on
- Remove flare nuts attached to indoor and
outdoor unit, then put them on pipe/tube
having completed burr removal.
(not possible to put them on after flaring
work)
Flaring work
- Carry out flaring work using flaring tool as
shown below.
Outside diameter
mm
inch
Ø6.35
Ø9.52
Ø12.7
Ø15.88
Ø19.05
Firmly hold copper pipe in a bar in the
dimension shown in the table below.
A
mm
1/4
1.1~1.3
3/8
1.5~1.7
1/2
1.6~1.8
5/8
1.6~1.8
3/4
1.9~2.1
Copper
Slanted Uneven Rough
tube
90°
Pipe
Point down
Flare nut
Copper tube
Bar
Bar
"A"
Copper pipe
Clamp handle
Reamer
Handle
Yoke
Cone
Red arrow mark