hit counter script

Install Power Bar Onto Frame Supports; Check The Evenness; Bring Power Bar Into Position; Attach Power Bar To Frame Supports - NEC FA Series User Manual

Led wall bundle fine pitch led video display indoor
Hide thumbs Also See for FA Series:
Table of Contents

Advertisement

6.2 Install Power Bar onto Frame Supports

This section is a guide to mounting the Power bar onto the frame supports and describes the
following in more detail:
Prepare the frame supports so they are level.
Position the Power bar on the frame supports.
Then fix the Power bar onto the frame supports.

Table 9: Power Bar Installation Requirements

No. of People 2
Prerequisites
Frame support securely installed
Power bar/LED Wall not connected to mains
Tools
Alignment bar
Spirit level
Screwdriver
Equipment
Power bar

Check the Evenness

Use the Alignment bar and spirit level in combination to check the evenness between
the vertical frame supports.
If necessary, adjust top and bottom supports accordingly.

Bring Power Bar into Position

Bring the Power bar into position to align interface to anchoring point.
Align the locating pin of the Power bar to the frame support interface.
Figure 48: Wall Mounting: Attachment of Power Bar (5×5 Frameset)

Attach Power Bar to Frame Supports

Use M6×12 Screws (4 per frame support) to
attach Power bar onto the frame supports.
Check that the Power bar is level. If
necessary, adjust accordingly.
Tighten the screws.

Figure 49: Wall Mounting: Attachment of Power Bar (Detail)

© NEC Corporation 2019
42

Advertisement

Table of Contents
loading

Table of Contents

Uploaded: cache9/manual/1873931/Nec-Fa-Series.html%3Fpage%3D42.gz