15. Installation
3) Flaring Work
Main cause for gas leakage is due to defect in flaring work. Carry out correct flaring work in the following proce-
dure.
Cutting the pipes and the cable.
1. Use the piping kit accessory or the pipes purchased
locally.
2. Measure the distance between the indoor and the out-
door unit.
3. Cut the pipes a little longer than measured distance.
4. Cut the cable 1.5m longer than the pipe length.
Removing burrs
1. Completely remove all burrs from the cut cross section
of pipe/tube.
2. Put the end of the copper tube/pipe in a downward
direction as you remove burrs in order to avoid drop-
ping burrs into the tubing.
Putting nut on
1. Remove flare nuts attached to indoor and outdoor unit,
then put them on pipe/tube having completed burr
removal.
(not possible to put them on after flaring work)
Flaring work
1. Firmly hold copper pipe in a die in the dimension shown in the table below.
2. Carry out flaring work with the flaring tool.
Outside diameter
mm
inch
Ø6.35
1/4
Ø9.52
3/8
Ø12.7
1/2
Ø15.88
5/8
Ø19.05
3/4
A
mm
0~0.5
0~0.5
0~0.5
0~1.0
1.0~1.3
Ceiling & Floor, Ceiling Suspended (50Hz, R22)
Copper
Slanted Uneven Rough
pipe
90°
Point down
Flare nut
Copper tube
Bar
Bar
Copper pipe
Clamp handle
Pipe
Reamer
Handle
Yoke
Cone
Red arrow mark
75

Advertisement

Table of Contents
loading

Table of Contents

Uploaded: cache9/manual/1562616/Lg-Lv-B1864cl.html%3Fpage%3D76.gz