15. Installation
• Insert the nuts and washer onto the suspension
bolts for locking the suspension bolts on the ceiling.
• Mount the suspension bolts to the anchor-nuts firm-
ly.
• Secure the Installation plates onto the Suspension
bolts (adjust level roughly.) using nuts, washers and
spring washers.
• Engage 2 hooks on the both left and right side
of the unit to the lower slot of Installation
Plates.
• Adjust a level with a level gauge on the direc-
tion of left-right, back-forth by adjusting sus-
pension bolts.
• Move the hooks on the unit to the upper slot of
Installation Plates. Then the unit will be
declined to the bottomside so as to drain well.
60
Ceiling & Floor, Ceiling Suspended (50Hz, R22)
Anchor nut
1)
Ceiling
Nut
Suspension
bolts
Suspension
bolts
Spring
washer
Nut
max.
12mm
Washer
2)
Lower slot
Level gauge
Suspension
bolt
Installation plate
Washer
Adjust a level
Upper slot