hit counter script

LG LV-B1864CL Product Data page 79

Ceiling & floor 50hz, r22, ceiling suspended 50hz, r22
Hide thumbs Also See for LV-B1864CL:
Table of Contents

Advertisement

15. Installation
5) Connection of the pipes-Outdoor
Align the center of the pipings and sufficiently tighten
the flare nut by hand.
Finally, tighten the flare nut with torque wrench until the
wrench clicks.
• When tightening the flare nut with torque wrench,
ensure the direction for tightening follows the arrow on
the wrench.
Outside diameter
mm
inch
Ø6.35
1/4
Ø9.52
3/8
Ø12.7
1/2
Ø15.88
5/8
Ø19.05
3/4
78
Ceiling & Floor, Ceiling Suspended (50Hz, R22)
Torque
kg . m
1.8
4.2
5.5
6.6
6.6
Outdoor unit
Outdoor unit
Gas side piping
Liquid side piping
(Bigger diameter)
(Smaller diameter)
Gas side
piping
Liquid side
(Bigger
piping
diameter)
(Smaller
diameter)
Torque wrench
Torque wrench

Advertisement

Table of Contents
loading

Table of Contents

Uploaded: cache9/manual/1562616/Lg-Lv-B1864cl.html%3Fpage%3D79.gz