Installation
Installation map (150 / 200 CMH)
OA
More than 3
times the size
(Above PET
of the duct
EA
Duct slope: More than 1/30(wall side)
obtaining of right distance
(Preventing penetration of rain water)
50 mm above
Insulator
10 mm)
1 m above
Maintenance space
50 mm above
50 mm above
Inhalation
Flexible duct
1 m above
30 mm above
640 mm above
Installation manual 15
Installation
RA
SA