hit counter script

Install The Ops Slot-In Pc - NEC 55" InfinityBoard 2.1 User Manual

All-in-one collaboration solution
Hide thumbs Also See for 55" InfinityBoard 2.1:
Table of Contents

Advertisement

Install the OPS slot-in PC

1. rite down the indows 10 license code; this key
is required to activate indows.
The code is located on the rear-side of the OPS
slot-in PC.
2. Turn off the main power switch on the monitor.
3. Attach the antennas to the OPS.
4. Remove the attached slot cover by unscrewing the
installed screws, then slide the cover to the right
and remove it.
5. Insert the OPS slot-in PC into the monitor, and
then fasten it in place with the screws removed
in step 4. (Recommended Fasten Force: 139 -
189N•cm)
OOTE:

Do not apply excessive force when inserting
the OPS and fastening it with screws. If the
OPS cannot be fully inserted, or if its bracket
does not align with the screw holes in the
monitor, make sure that it is inserted in the
correct orientation.
CAUOIOE:

Ensure the OPS slot-in PC is securely
attached with the screws. If the OPS is
not securely installed, it may fall out
and expose you to danger.
ON/OFF
SSD
English−12
ANT1
ANT2
USB
USB-C
DP++
DP++
USB 3.0
LAN

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ib554q-2.1Infinityboard 2.1

Table of Contents

Uploaded: cache9/manual/2415144/Nec-55-Infinityboard-2-1.html%3Fpage%3D12.gz