hit counter script

Installation; Indoor Unit Installation - LG APNQ55GT3E0 Installation Manual

Floor standing
Hide thumbs Also See for APNQ55GT3E0:
Table of Contents

Advertisement

INSTALLATION

8
INSTALLATION

Indoor unit installation

1
The mounting floor should be strong and
solid enough to prevent it from vibration.
2
Drill the piping hole with 70 mm diameter
hole-core drill at either the right or the left
of indoor unit. The hole should be sightly
slant to the outdoor side.
200 mm
70 mm
Wall
INSIDE
Core Drill
3
Insert the plastic tube through the hole.
4
Cut the extruded outside part of the plastic
tube, if necessary.
Wall
INSIDE
Plastic tube
(Bushing)
70 mm
OUTSIDE
OUTSIDE
Tilt
Cut if
necessary
More
than 15 mm
- When using knock-out hole to route
the piping, insert the plastic cover in
knock-out hole in order to prevent the
piping from damaged by sharp edge of
the hole.
Knock-out hole

Advertisement

Table of Contents
loading

Table of Contents

Uploaded: cache9/manual/1856661/Lg-Apnq55gt3e0.html%3Fpage%3D8.gz