Page 1
UPS5000 Optional BSC Card User Manual Issue Date 2019-12-10 HUAWEI TECHNOLOGIES CO., LTD.
Page 2
Notice The purchased products, services and features are stipulated by the contract made between Huawei and the customer. All or part of the products, services and features described in this document may not be within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information, and recommendations in this document are provided "AS IS"...
User Manual About This Document About This Document Purpose This document describes the optional BSC card for the UPS5000 in terms of its performance specifications, appearance, structure, installation, and operation and maintenance (O&M). Intended Audience This document is intended for: ...
UPS5000 Optional BSC Card User Manual 1 Safety Precautions Safety Precautions Only professional technical personnel designated by Huawei are allowed to install and operate the product. High voltage operations and installation of AC-powered facilities must be performed by qualified personnel.
An optional BSC card enables Huawei's UPS and other vendor's UPS to form a dual-bus system. With the optional BSC card, Huawei UPS can function as a slave device to trace the output phases of other vendor's UPS or the phases of other 80–280 V AC power supplies in real time.
Page 9
3 Installing an Optional BSC Card Step 2 Insert the optional BSC card into the control module in Huawei's UPS and secure the card. The optional BSC card must be installed in the control module that contains a monitoring interface card.
4 Setting BSC Card Parameters Setting BSC Card Parameters Procedure Step 1 Log in to Huawei's UPS LCD. The initial passwords for admin and operator are both 000001. This document corresponds to the monitor display module (MDU) version V126B083D00 and is for reference only.