Page 2
Notice The purchased products, services and features are stipulated by the contract made between Huawei and the customer. All or part of the products, services and features described in this document may not be within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information, and recommendations in this document are provided "AS IS"...
Before the installation, pay attention to the following items: The customer's technical engineers must be trained by Huawei and be familiar with the proper installation and operation methods. ...
RRU3260 Installation Guide 3 Information About the Installation Figure 3-4 Recommended usage of the RF ports on an RU used for DBS3900 LTE V100R003C00 and later versions 3.3 RU Indicators This section describes six indicators on an RU. They indicate the running status.
The total number does not tally with Find out the cause and report any missing the packing list articles to the local Huawei office. Step 2 Check the exterior of the packing case. If ... Then ... The outer packing is intact...
Page 40
Sign the Packing List with the customer. with those on the packing list Either shipment shortage, wrong Report to the local Huawei office. shipment or damaged articles. To protect the equipment and prevent damage to the equipment, you are advised to keep...
A connector or OT terminals are added to the RU power cable on the power device side. For details, see the DBS3900 Installation Guide. Context If a power device provided by the customer is used, the recommended specification of the circuit breaker on this power device is 15 A to 30 A.
A CPRI fiber optic cable transmits CPRI signals between a BBU and an RU. For details about CPRI fiber optic cable connections, see section "CPRI Cable Connections" in the BBU3900 Hardware Description or DBS3900 Hardware Description. Procedure Step 1 Lower the pullers of two optical modules, insert one optical module into the CPRI0 port on...