hit counter script

Step2 - LG V-net PDRYCB000 Installation Manual

Hide thumbs Also See for V-net PDRYCB000:
Table of Contents

Advertisement

Step 2
Connect CN_DRY with Control Unit .
(Fix SUB PCB into the proper location.)
- To apply power source through PCB
- To apply power source directly to external source
LG does not
Supply this section
4 3 2 1
RLY1
RLY2
CN-CC
2 1
N
LG does not
Supply this section
4 3 2 1
RLY1
RLY2
CN-CC
Operation Display
Error Check Display
Dry contact
Controller
AC 220V
L
INPUT
AC 220V
Operation Display
Error Check Display
Dry contact
Controller
AC 220V
AC 220V
Installation Manual 13
Installation Guide

Advertisement

Table of Contents
loading

Table of Contents

Uploaded: cache9/manual/1434001/Lg-V-Net-Pdrycb000.html%3Fpage%3D13.gz