Page 1
5800/1160Xd/1320Xd XPRESS I n s t a l l a t i o n P r o c e d u r e s...
Page 2
NEC Solutions (America), Inc. To allow for design and specification improvements, the information in this document is subject to change at any time, without notice.
Safety Notices for Users Outside of the U.S.A. and Canada... 3 If you Need Help... 3 Selecting a Site... 3 Unpacking the Server ... 4 Unpacking Procedure ... 5 Installing the Side Stabilizer Kit... 11 Attaching the Power Cables ... 12 Attaching the LAN Cables ...
Introduction These installation procedures provide information for unpacking and installing the Express5800/1160Xd/1320Xd Server. Read these procedures in their entirety before performing the installation to become familiar with the components and the sequence of steps you will perform. Symbols and Conventions This guide uses the following text conventions and graphics symbols.
To avoid a risk of injuries, installation should be performed by trained technical personnel. It takes at least two people to unpack your server and two people to maneuver the server, after unpacking. Your server is equipped with a front stabilizer. Engage the front stabilizer during installation.
Be sure the power service connection is through a properly grounded outlet. All AC connections to the server must be plugged into the same common ground power outlets. 1-866-269-1239 WARNING...
Spacious enough to provide at least 2 feet (0.6 meters) behind the server, 3 feet (1.0 meters) in front of the server and 19.0 inches (0.5 meters) on each side of the server for proper cooling, airflow, cable clearance and maintenance.
Figure 1 shows the Model 1160Xd/1320Xd shipping container. The smaller container (not shown) includes the following contents: Server Stabilizer Kit Accessory Box. Figure 1. Shipping Container Unpacking Procedure Note: It is recommended that you save the shipping container, should the server require transport to another location at a later date.
Page 10
4. Release the Velcro tapes that secure the front, rear, and side covers of the shipping box. See Figure 3B. 5. Remove the shipping container surrounding the server and set it aside. See Figure 3C. Figure 3. Removing the Cardboard Covers Plastic straps securing the packaging may cause injury if the straps snap loose when cut.
Page 11
7. Remove the corrugated cardboard protecting the top of the cabinet. See Figure 4B. Figure 4. Removing the Corner and Top Protectors 8. Cut and remove the plastic stretch film that is wrapped around the server. See Figure 4C. 9. Remove the unloading ramp and set it aside. See Figure 5A.
Page 12
See Figure 6B. Figure 6. Removing the Cardboard Covers 13. Place the unloading ramp in front of the rear of the server and secure the ramp to the pallet using the ramp plate removed in Step 10. See Figure 7.
Page 13
14. Position a person at the front of the server (rear of pallet) and one person standing on the ramp at the rear of the server. Grasp the corners of the server.
Page 14
18. Once the server is located in its designated position, using an adjustable wrench, lower the leveling pads to secure the server in place. See Figure 9A. Figure 9. Lowering the Leveling Pads 20. At the front of the system. Remove the single screw securing the front stabilizer and pull the stabilizer out from the cabinet as shown in Figure 10.
Accessory box. 1. Position a stabilizer bracket on each side of the cabinet. 2. Secure each stabilizer bracket to the cabinet with three M4 screws provided. See Figure 11. Side Stabilizers Figure 11. Installing the Side Stabilizers Express5800/1160Xd/1320Xd Installation Procedures 11...
4. Carefully route the LAN cables along the left side of the cabinet and through the open channel to the rear of the server. Use the cable ties at the rear of the server to secure the cables. Route the cables to the left side of the server and down under the cabinet frame.
Page 17
Service Processor Boards Open Channel Figure 13. Connecting and Routing the LAN Cables (1160Xd) Service Processor Boards Open Channel Figure 14. Connecting and Routing the LAN Cables (1320Xd) Express5800/1160Xd/1320Xd Installation Procedures 13...
Page 18
ETHER Connector Figure 15. Locating the Service Processor Board ETHER Connector 14 Express5800/1160Xd/1320Xd Installation Procedures...