hit counter script

Handle; Mark The Positions Of The Anchor Points On The Wall - NEC FA Series Installation And Maintenance Manual

Led module/led display
Hide thumbs Also See for FA Series:
Table of Contents

Advertisement

2. Handle

Use the handles when carrying and installing the cabinet.
Put the handles in their original positions after the installation work has been completed.
When carrying or installing the
cabinet, pull out the handles on
both sides.

3. Mark the positions of the anchor points on the wall

• Mark the positions of the holes you will make for the anchor points (refer to the figures below and the
"Anchor points number and positions" table on the next page).
• Before making the holes, check the verticality of the marks using a spirit level or a laser line level.
(We recommend using a laser line level is recommended for accuracy.)
Anchor points positions: 4 x 4 frame set
1026 mm
608 mm
608 mm
Put the handles back after the
work has been completed.
English - 18

Advertisement

Table of Contents
loading

Table of Contents

Uploaded: cache9/manual/3412667/Nec-Fa-Series.html%3Fpage%3D20.gz