5. Assembly Diagram
Assembly Diagram - PRIP0
n High Static Duct/FAU
Step1. Open control box cover.
Step3. Open the cover of PRIP0 and connect wires.
Note: While connecting the PRIP0, attach insulation at the rear of the control box cover
where it receives screws as shown in Fig. A.
!
CAUTION
Check the distance between PRIP0 and a control box when
connecting anchor bolts.
Step2. Assemble PRIP0 with control box cover.
Step4. Assemble control box cover.
L
Control box cover
3
Chassis
BH
BG
BR
B8
Assembly Diagram
Insulation
Fig. A
screw
(Unit : mm)
L
1 090
1 350
1 400
1 720
Installation Manual 9